Ticketmaster — Deal Risk Assessment

2026-03-25 · Ticketmaster Web Experimentation · Proof-of-Value → $882K (proposed Y1)
Deal Snapshot
Account / Deal
Ticketmaster — Web Experimentation
Owner
Ted Charles (AE) · Conor Leary / Richard Cockshott (overlay)
Stage / Target Close
Proof-of-Value / TBD (no close date set)
Size / Strategic Importance
$882,000 (proposed Y1) / High (global entertainment, Monetate displacement)
Key Champion(s)
Krista Lowry (experimentation strategy) · Brad Bensen (engineering/architecture) · Jordan Stone (experimentation lead)
Current Status (3/25)
Web experimentation POC kicked off 3/18 with Chester Militante and Iqbal Sandhu. FX POC prototype running in alpha (Brad’s server-side bucketing service on Fastly). Implementation estimated 3–5 days, soft POC deadline April 3rd with extension option. MSA redlines stuck with Aisha (legal unresponsive for weeks). POC terms dropped (dev-only environment). Weekly cadence calls proposed but not confirmed. Pricing conversation with Deeplaxmi still needed — ~$500K budget vs. $882K proposed. Mobile scope TBD. Sawmill (CPO) engagement gated on POC progress. Third-party compliance review pending (Mike Dillon). Updated SSA to be sent.
Total Risks
8
Known Risks
7
Assumed Risks
1
Play Code Legend
P1ELT exec bridge (C-suite ↔ C-suite)
P2SLT bridge (VP/Director ↔ VP/Director)
P3Back-channeling / political intel
P4Value / business outcomes workshop
P5Technical / architecture risk session
P6Commercial alignment session
P7On-site
P8Own internal business case structure
P9Customer-facing exec 1-pager
P10Internal exec briefing 1-pager
P11Pricing / term levers
Risk Table
ID Category Risk Evidence Impact Plays Owner & By When
R1 Paper MSA redlines stuck — Aisha (legal) unresponsive for weeks
Known
• MSA and POC terms given to Aisha weeks ago with no response
• Aisha deprioritized MSA while focused on POC terms (now dropped since POC is dev-only)
• Deeplaxmi was unaware POC moved to dev-only until 3/2 call
• No confirmation legal has begun reviewing SSA
• SSA needs to be refreshed (product supplement changes)
Critical path blocker. Even with successful POC, cannot close without executed MSA. Every week of legal silence adds a week to close timeline.
P6 P3
Deeplaxmi by 4/1 (follow up with Aisha). Ted/Conor escalate if no response by 4/7
R2 Timing POC execution risk — engineering teams may “go dark”
Known
• Rich explicitly flagged pattern of engineering teams going silent, struggling, and abandoning evaluations
• Deeplaxmi acknowledged this has happened before at Ticketmaster
• Chester and Iqbal just onboarded to Slack/accounts as of 3/18 (late start)
• Krista hedged on committing to POC end date
• Web experimentation POC keeps getting deferred while FX progresses
POC drift kills deal momentum. Brad's prototype has a shelf life. If web POC stalls while FX progresses, creates uneven evaluation.
P5 P3
Zach — proactive Slack weekly. Conor — set up weekly cadence by 3/28
R3 Technical Edge delivery gap on Fastly — web snippet may not achieve zero-flicker
Known
• Web experimentation edge delivery not available on Fastly today
• Standard snippet with best-practice implementation is the current approach
• If snippet doesn’t achieve zero flicker, fallback is product conversation to accelerate Fastly support
• Personnel changes on Optimizely product side (Dehan possibly leaving)
• FX architecture (Brad’s bucketing service) already solved this for feature flags
Flicker elimination is THE primary decision criterion. If web snippet flickers, entire web experimentation value proposition collapses.
P5 P10
Conor/Rich — Britt Hall outreach by 4/4. Simone — best-practice snippet implementation during POC
R4 Commercial Budget constraint — $500K available vs. $882K proposed
Known
• 2025 pricing ended with TM requesting Monetate-level pricing; Optimizely above that
• Mobile is the largest scope/pricing variable and remains TBD
• Kirk’s mobile team not ready (focused on Sawmill’s mobile-first build)
• No pricing conversation has occurred since 2025
• Pricing expectations may be anchored to Monetate levels
Deal value at risk of significant compression. May need to scope to web+FX only (no mobile) to fit budget. Monetate pricing anchor requires reset.
P6 P11
Ted/Rich/Conor + Deeplaxmi — pricing meeting by 4/11. Prepare Monetate comparison and scope models
R5 Political Sawmill (CPO) access gated behind POC progress — no executive engagement path
Known
• Deeplaxmi explicitly won’t raise CEO-to-Sawmill intro until positive POC feedback
• Sawmill formerly at Block (550 experiments/year with Optimizely) — natural alignment
• No response from Deeplaxmi on executive connection request
• Sawmill is the ultimate authority on experimentation investment
Cannot build executive-level commitment without Sawmill. Budget ceiling and urgency constrained at Deeplaxmi’s level. Sawmill could accelerate or kill the deal.
P1 P3
Ted/Rich — prepare CEO pitch for when POC delivers. Conor — ensure demo-worthy POC results by early April
R6 Timing No close target date — open-ended evaluation with multiple unknown security/procurement gates
Known
• Krista confirmed no date for wrapping POC or completing legal
• “There’s always another step” beyond initial security submission
• Live Nation InfoSec sign-off required (no named contact)
• GDPR/CCPA privacy review required
• Additional security review required before platform onboarding
• Multiple internal review teams involved
Without close target, deal has no internal urgency. Each unknown gate adds weeks to months. Risk of evaluation extending through Q2 into Q3+.
P6 P8
Ted/Conor — push for mutual action plan during Deeplaxmi meeting. Krista/Aisha — map full procurement steps by 4/11
R7 Technical Web experimentation POC keeps getting deferred to FX
Known
• Web POC deferred in 1/28 kickoff (no time)
• Krista dropped off before web portion in 2/27 sync
• Separate web session had to be scheduled repeatedly
• Web experimentation requires separate third-party code review (just initiated 3/3)
• Web kicked off 3/18 but implementation just starting
Web is part of deal scope and Krista’s primary use case. If web POC doesn’t complete alongside FX, deal may close for FX-only at lower value.
P5
Conor/Zach — ensure web POC gets dedicated attention in weekly cadence. Krista — third-party code review by 4/11
R8 Political Mobile scope uncertainty creates pricing ambiguity and future friction
Assumed
• Kirk’s team “not now” but Deeplaxmi expects leadership will ask about app testing within months
• Mobile inclusion is the largest MAU/pricing variable
• Kirk wanted deeper technical dive that hasn’t materialized
• Peacock case study sent to Kirk — no response
If mobile excluded, creates reopen risk when leadership asks. If included, budget doesn’t support it. Unresolved scope creates commercial ambiguity.
P2 P6
Conor — get definitive mobile in/out from Deeplaxmi during pricing meeting. Prepare both scope models
Mitigation Plays — Cross-Mapping
P6 — Commercial Alignment Session
Risks: R1, R4, R6, R8
Pricing/scope/timeline conversation with Deeplaxmi is the single most impactful play. Resolves budget gap, MSA urgency, mobile scope, and close target in one session.
P5 — Technical / Architecture Risk Session
Risks: R2, R3, R7
Ensure POC execution, address Fastly edge gap, protect web experimentation scope. Weekly cadence calls are the mechanism.
P3 — Back-channeling / Political Intel
Risks: R1, R2, R5
Deeplaxmi as channel to Aisha. Weekly cadence for POC health monitoring. Prep Sawmill path through Deeplaxmi.
P11 — Pricing / Term Levers
Risks: R4, R8
Scope options to fit budget. Mobile phasing strategy. Monetate pricing comparison to reset anchoring.
P1 — ELT Exec Bridge
Risks: R5
CEO-to-Sawmill connection when POC delivers results. Sawmill’s Block background is the natural alignment point.
P8 — Own Internal Business Case
Risks: R6
Create mutual action plan with dates to force timeline discipline. Map all procurement/security gates with owners and deadlines.
AE Action Plan

Top Priorities (Must-Do)

1 [P6] Schedule pricing and scope meeting with Deeplaxmi
Linked Risks R1, R4, R6, R8
Due By 2026-04-11
Why No commercial conversation since 2025. Budget gap, mobile scope, MSA status, and close timeline all need resolution
Owner Ted Charles + Rich Cockshott + Conor Leary
2 [P5] Lock weekly POC cadence calls — ensure web experimentation gets dedicated time
Linked Risks R2, R3, R7
Due By 2026-03-28 (this week)
Why POC drift is the #1 pattern that kills this deal. Web keeps getting deferred. Weekly cadence is the guardrail
Owner Conor Leary + Zach Coulter
3 [P3] Get MSA status from Aisha through Deeplaxmi
Linked Risks R1, R6
Due By 2026-04-01
Why Legal silence is the critical path blocker. Direct outreach has not worked. Deeplaxmi is the only proven channel
Owner Conor Leary (request via Deeplaxmi)

Secondary Tasks

Internal Exec Support

Top Risks Requiring Exec Help

What We’ve Already Done

Specific Requests from ELT / SLT